Bridging and rat holing clogging on a double-extraction steel hopper
4 January 2023
Vacuuming of boiler ash
14 February 2023Leader in the cement industry
PROBLEM:
Build-ups in the preheating tower at the kiln inlet, smoke box, riser duct and bypass which require 8 hours’ cleaning per day (high-pressure and Cardox)
OBJECTIVE:
Eliminate concretion that affects the industrial process and reduces the production capacity

SOLUTION:
Installation of 85 AIRCHOC® DN150 air cannons with remote solenoid valves and 2 MACSYS.
RESULT:
100% satisfaction:
- No more build-up
- Increased use of alternative fuels
- Rapid return on investment