Build-ups in the preheating tower at the kiln inlet, smoke box, riser duct and bypass which require 8 hours’ cleaning per day (high-pressure and Cardox)
Eliminate concretion that affects the industrial process and reduces the production capacity
Installation of 85 AIRCHOC® DN150 air cannons with remote solenoid valves and 2 MACSYS.
100% satisfaction: