PROBLEM:
Loss of product overflowing on the conveyor. Flying dust.
OBJECTIVE:
To eliminate the loss of product and control dust emission.

SOLUTION:
15 m of LIFTUBE Large Width (the first in the USA)
RESULT:
Customer 100% satisfied with the solution, which was duplicated on sister sites.