Cement accumulation United Kingdom
21 November 2022
Accumulation of material in the grinding area
21 November 2022Quarry in Bulgaria
PROBLEM:
Leak of material on mill, conveyor and elevator base.
PRODUCT:
Limestone and carbonate
OBJECTIVE:
Reduce the accumulation of materials in order to keep the production facilities operational.

SOLUTION:
Electric UMA with 40 m of flexible tubes.
RESULT:
Productivity of the plant greatly improved with significantly fewer shutdowns.