PROBLEM:
We installed central industrial cleaning and developed a vacuum network for the cleaning of the DISA 2 area. In order to solve the cleaning problems in DISA 1, we were contacted to study the installation of a vacuum system for more powerful equipment, identical to DISA 2. The current cleaning is centralized by a 37Kw hoover coupled to a DN80 suction network with DN70 outlets.

SOLUTION :
The proposed solution is a vacuum unit identical to the installation previously carried out by Standard Industrie in this factory: a pre-separator and an electrical cabin.
RESULT:
The INC vacuum machine is more powerful with a critical point performance of 1 ton/h.