PROBLEM:

Significant material loss in this area of the conveyor. This part is visible to the public and is located right next to a popular public beach. Formation of a large dust cloud during operation.

Product conveyed by the conveyor: cement and clinker
Grain size: 40mm
Density: 1.5T/m³
Product temperature : 150°C
Maximum conveyor throughput: 650T/H.

The customer installed the LIFTUBE® on this critical part of the conveyor in order to drastically reduce cement loss

SOLUTION:

15 meters of LIFTUBH900 with a wide guideway from the main chute to the third chute, which is a filter return.

The customer installed the LIFTUBE® on this critical part of the conveyor in order to drastically reduce cement loss and consequently cleaning time. The aim was also to make this area, which is just a few dozen meters from a busy beach, clean.

RESULT:

  • Environment: Reduction of dust emissions between loading and unloading points and compliance with ISO 14001.
    Quality: Full protection of the material. No product pollution.
    Total safety: Protection of re-entry points.
8 March 2024

LIFTUBE® conveyor reduces material loss in a cement plant

22 February 2024

Vacuum cleaning of clinker in a cement plant

14 February 2023

Cleaning the cement plant

4 January 2023

Build-ups in the preheating tower

21 November 2022

Reduction of dust emissions

21 November 2022

Cement accumulation United Kingdom

21 November 2022

Avoiding build-ups in the riser ducts

21 November 2022

Eliminate build-up on the preheating tower

18 October 2022

Cement plant in the USA


Call

Contact